Developing 5D system connecting cost, schedule and 3D model

Kim, Hando, Benghi, Claudio, Dawood, Nashwan, Jung, Doyoung, Kim, Jaehong and Baek, Yeongin (2010) Developing 5D system connecting cost, schedule and 3D model. In: IABSE Symposium Symposium on Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, 22-24 September 2010, Venice, Italy.

Full text not available from this repository. (Request a copy)
Official URL: http://dx.doi.org/10.2749/222137810796024998
Item Type: Conference or Workshop Item (Paper)
Subjects: H200 Civil Engineering
Department: Faculties > Engineering and Environment > Mechanical and Construction Engineering
Depositing User: Claudio Benghi
Date Deposited: 03 Apr 2013 15:23
Last Modified: 13 Oct 2019 00:30
URI: http://nrl.northumbria.ac.uk/id/eprint/11888

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year

View more statistics