A case study of the impact of cultural differences during a construction project in Ghana

Furber, Alison, Smith, Simon David and Crapper, Martin (2012) A case study of the impact of cultural differences during a construction project in Ghana. In: Proceedings 28th Annual ARCOM Conference. ARCOM, pp. 553-562. ISBN 978-0-9552390-6-9

Full text not available from this repository. (Request a copy)
Official URL: http://www.arcom.ac.uk/-docs/proceedings/ar2012-05...

Abstract

The lack of native engineers in developing countries means that often foreign engineers have a role to play in implementing the water and sanitation systems for rural communities as needed to meet the Millennium Development Goals targets for access to clean water and sanitation facilities. However, cultural differences between foreign engineers and local communities can lead to ineffective project management where these differences are not identified and managed successfully. A case study of a water and sanitation project undertaken in the Eastern Region of Ghana, with a British engineer and project manager, is used as the basis for exploration of some of the issues that arise when engineers work cross-culturally on this type of project. Hofstede's cultural dimensions are used as a conceptual paradigm through which to understand the behaviours and actions observed during the case study. The aim is to identify possible explanations for why cultural tensions arose during the project as a step towards understanding how these tensions might be reduced or eliminated in future projects in similar cultural contexts. It is found that cultural differences between engineer and community at the case study project led to issues with communication and implications for the effectiveness of different management structures. Findings may have broad relevance and help other engineers avoid some of the pitfalls of working in a cross-cultural context.

Item Type: Book Section
Subjects: H200 Civil Engineering
Department: Faculties > Engineering and Environment > Mechanical and Construction Engineering
Depositing User: Becky Skoyles
Date Deposited: 07 Jun 2016 10:43
Last Modified: 12 Oct 2019 22:52
URI: http://nrl.northumbria.ac.uk/id/eprint/27028

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year

View more statistics