Davidson, Jordan, Fowler, John, Pantazis, Charalampos, Sannino, Massimo, Walker, Jordan, Sheikhkoshkar, Moslem and Rahimian, Farzad Pour (2020) Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: a proof of concept study. Frontiers of Engineering Management, 7 (3). pp. 396-403. ISSN 2096-0255
|
Text (Final published version)
Davidson2020_Article_IntegrationOfVRWithBIMToFacili.pdf - Published Version Available under License Creative Commons Attribution 4.0. Download (699kB) | Preview |
|
|
Text (Advance online version)
Davidson2019_Article_IntegrationOfVRWithBIMToFacili.pdf - Published Version Available under License Creative Commons Attribution 4.0. Download (701kB) | Preview |
|
|
Text
Davidson et al - Integration of Virtual Reality Applications with BIM AAM.pdf - Accepted Version Available under License Creative Commons Attribution 4.0. Download (599kB) | Preview |
Abstract
As time goes on and building practices change, procedures that at one point seemed indispensable can fall by the wayside. One such example is the bill of quantities (B/Q). Research into the extant literature attributes declining use of B/Qs to a multitude of reasons, such as its complexity and potentially drawn-out time to produce, non-traditional procurement systems growing in popularity and the challenge of using its information in a construction schedule. With these issues in mind, a combined process of Building Information Modelling (BIM), Virtual Reality (VR) and including the client in the design process has been proposed as a potential solution. Following a literature review and precedent study, an experiment was carried out using this new process to simulate a client’s design decisions on window and interior furnishings, specifically. Their choices made using VR automatically updated a B/Q Revit Schedule and allowed the client to have a firm grasp on the project costs. Not only did this process give the client more confidence in a pleasing final outcome, but the technology ensured an up-to-date, accurate and easily understood B/Q. Here lies great potential savings in cost, time and gives the B/Q a newfound importance in future construction processes. The research case presented in this paper was a stepping stone in exploring new opportunities offered by VR and BIM and how they could improve the reliability and accuracy of traditional procurement within construction, specifically within the B/Q document.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Virtual reality, Bill of Quantities, BIM, Revit, Real-Time Synchronisation |
Subjects: | G400 Computer Science K200 Building |
Department: | Faculties > Engineering and Environment > Mechanical and Construction Engineering |
Depositing User: | Paul Burns |
Date Deposited: | 01 Apr 2019 14:01 |
Last Modified: | 31 Jul 2021 13:04 |
URI: | http://nrl.northumbria.ac.uk/id/eprint/38668 |
Downloads
Downloads per month over past year