Hussey, Henry, Thurairajah, Niraj, Ginige, Kanchana and Goulding, Jack (2019) Establishing Descriptions of Building Work in UK. In: Proceedings of the 35th Annual ARCOM Conference, 2-4 September 2019, Leeds, UK. Association of Researchers in Construction Management, Leeds, pp. 283-292. ISBN 9780995546349
|
Text
ESTABLISHING_DESCRIPTIONS_OF_BUILDING_WORK.pdf - Published Version Download (444kB) | Preview |
Abstract
There is continual need to describe building work. Whether programming, estimating, issuing instructions, writing up a journal or other activity, it is difficult to conceive of project situations where such descriptions are not required. It is therefore surprising to find that there is no standard method of describing the physical effort of construction used in the UK. The descriptions in general use in the UK are derived from SMM/ NRM2 (1922-2013) and from quantity surveyors’ methods of working. Despite such descriptions being thought to inform about building work, those nine documents, spanning a century, state that labour and other items are not included, deeming that contractors must allow for them. Coupled with that situation, current tendency toward collaboration between designers and contractors at early stage of design increases the need for a means of communication between the parties which expresses financial consequences of designers’ decisions. This paper, via critical literature review and comparison of editions, exposes misunderstandings surrounding the use of SMM/NRM2, looking at why it is criticised for failing to do that which was never intended, how information which it is expected to provide may be given effectively, and how a system of dealing with that additional information can synchronise with the existing. The method of constructing such a system requires that ‘work’, and the products of that work are defined in a particular manner so that it may be observed and recorded. By document analysis and literature synthesis, the requirements for such definition are examined and suggestions given for further work in the field. It is hoped that development will pave the way for a comprehensive standard method of description of building work that takes all factors of contractors’ construction cost into consideration.
Item Type: | Book Section |
---|---|
Uncontrolled Keywords: | communication, Descriptions, Building work, Cost significance |
Subjects: | K100 Architecture K200 Building |
Department: | Faculties > Engineering and Environment > Architecture and Built Environment |
Depositing User: | Elena Carlaw |
Date Deposited: | 14 Oct 2019 13:36 |
Last Modified: | 31 Jul 2021 10:34 |
URI: | http://nrl.northumbria.ac.uk/id/eprint/41099 |
Downloads
Downloads per month over past year