Johansen, Eric (1995) Hard or soft: Planning on medium size construction projects. In: Proceedings 11th Annual ARCOM Conference. Annual Association of Researchers in Construction Management, Loughborough.
|
PDF (Conference paper)
e johansen (1995) Hard or Soft Planning.pdf Download (135kB) | Preview |
Abstract
Some data suggest that the approach to planning in construction seeks to impose a managed future on construction work by providing plans which are strictly time scheduled and produced by initially identifying those activities which are critical to the plan and allowing other activities to “fit in” to this critical path. This is referred to in the paper as “hard” planning. The paper seeks to demonstrate that the reality for some managers and planners is that the planning process is “soft” and that in producing plans they seek initially to take account of the vast uncertainties of construction by removing criticality from all activities. The paper is based on data obtained from longitudinal case study research of four live, medium size, projects in the North East of England. The data analysis uses the Grounded Theory approach.
Item Type: | Book Section |
---|---|
Additional Information: | Presented at the 11th Annual ARCOM Conference, held at the University of York, York, UK from 18 - 20 September 1995. |
Subjects: | K200 Building K900 Others in Architecture, Building and Planning |
Department: | Faculties > Engineering and Environment > Mechanical and Construction Engineering |
Related URLs: | |
Depositing User: | EPrint Services |
Date Deposited: | 09 Feb 2011 09:32 |
Last Modified: | 17 Dec 2023 13:19 |
URI: | https://nrl.northumbria.ac.uk/id/eprint/3453 |
Downloads
Downloads per month over past year