Determination of Initial and Final Set of Ternary Mortars and Compressive Strength with Regard to Temperature Variation

Richardson, Alan, Dawson, Susan and Pesce, Giovanni (2019) Determination of Initial and Final Set of Ternary Mortars and Compressive Strength with Regard to Temperature Variation. Journal of Civil Engineering and Construction, 8 (1). pp. 8-12. ISSN 2051-7777

[img]
Preview
Text
125_Article_262_1_10_20190114.pdf - Published Version
Available under License Creative Commons Attribution 4.0.

Download (2MB) | Preview
Official URL: https://doi.org/10.32732/jcec.2019.8.1.8

Abstract

The research examined herein classifies initial and final set times, for samples of ternary mortars composed of CEM 1 (52.5) and Ground Granulated Blast Furnace Slag (GGBS). The samples tested comprised of different CEM 1 and GGBS proportions. The mixes used, ranged from 100% CEM1 where this component was replaced at 10% increments by mass terminating at a 20% CEM1 content. With a reduction in cement content, the balance of the total required binder was being made up with GGBS. The ternary mortar cubes were tested for initial and final set times at average ambient room temperature (19.7 – 22.2 °C) and temperatures of 5 and 40 degrees Celsius. The findings highlighted the additional time required for initial and final set times at reduced temperatures and it also highlighted the further additional time for initial and final set times when GGBS is used as a cement replacement in progressively increasing quantities. Initial and final set times at 40 degrees Celsius were faster than ambient and 5 degrees Celsius, however the difference between initial and final set times was much reduced at 40 degrees Celsius. Both temperature and cement replacement affected the compressive strength at a curing period of 28 days, however GGBS is known to take longer than CEM1 to achieve a given strength development of say 90% of the final or ultimate strength. The two factors of temperature and cement replacement have a significant impact on setting times.

Item Type: Article
Uncontrolled Keywords: CEM1, Ground granulated blast furnace slag, Initial and final setting times, strength, Temperature, environment
Subjects: H300 Mechanical Engineering
K100 Architecture
K200 Building
Depositing User: Elena Carlaw
Date Deposited: 18 Jan 2019 12:06
Last Modified: 01 Aug 2021 07:32
URI: http://nrl.northumbria.ac.uk/id/eprint/37649

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year

View more statistics