Hybrid Genetic Algorithm-Simulation Optimization Method for Proactively Planning Layout of Material Yard Laydown

Alanjari, Pejman, RazaviAlavi, SeyedReza and AbouRizk, Simaan (2015) Hybrid Genetic Algorithm-Simulation Optimization Method for Proactively Planning Layout of Material Yard Laydown. Journal of Construction Engineering and Management, 141 (10). 06015001. ISSN 0733-9364

[img]
Preview
Text
Approved-Hybrid Genetic Algorithm-Simulation Optimization Method for Proactively Planning Layout of Material Yard Laydown.pdf - Accepted Version

Download (678kB) | Preview
Official URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001017

Abstract

This paper presents a hybrid optimization method combining a genetic algorithm (GA) and simulation for planning the layout of material yard laydown areas. An optimized material yard layout entails efficiency in terms of time and cost for decision makers who seek increased performance in material handling, availability, and accessibility. Laying out materials on yards is mostly performed reactively in current practice, where the planner decides daily where to position the incoming materials, based on the list of material arrival and required materials for consumption, received daily. This policy cannot account for the dynamism of material flow in and out of the yard during a construction project. In contrast, a proactive materials placement policy can be used to address this concern based on incoming and outgoing material schedules for a certain period of time. This paper aims to evaluate the proactive material placement policy and present an integrated framework to determine the optimum layout for placing materials resulting in minimum material haulage time. To this end, a hybrid optimization is implemented through a case study from the steel fabrication industry, where an effective materials handling method could be of great significance. The major contribution of this work is the development of an approach that performs dynamic layout optimization of materials arriving at construction yards, using GA to heuristically search for the solution, and use of simulation to model the material handling process and determine the material haulage time. Results of the analyses show clear merits of proactive material placement over the reactive strategy and demonstrate the importance of GA and simulation integration to obtain more realistic outcomes.

Item Type: Article
Uncontrolled Keywords: Material management, Material handling, Layout planning, Simulation, Genetic algorithm, hybrid optimization
Subjects: H200 Civil Engineering
H300 Mechanical Engineering
Department: Faculties > Engineering and Environment > Mechanical and Construction Engineering
Depositing User: Elena Carlaw
Date Deposited: 16 Jul 2020 12:53
Last Modified: 31 Jul 2021 11:49
URI: http://nrl.northumbria.ac.uk/id/eprint/43794

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year

View more statistics