Risk-embedded scheduling of a CCHP integrated with electric vehicle parking lot in a residential energy hub considering flexible thermal and electrical loads

Saberi-Beglar, Kasra, Zare, Kazem, Seyedi, Heresh, Marzband, Mousa and Nojavan, Sayyad (2023) Risk-embedded scheduling of a CCHP integrated with electric vehicle parking lot in a residential energy hub considering flexible thermal and electrical loads. Applied Energy, 329. p. 120265. ISSN 0306-2619

[img]
Preview
Text
Kasra_Paper1_2_.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial No Derivatives 4.0.

Download (2MB) | Preview
Official URL: https://doi.org/10.1016/j.apenergy.2022.120265

Abstract

Climate change has detrimental impacts on the environment and sustainability, leading to employing alternative energy systems such as combined cooling, heat and power (CCHP). The concept of integrated energy systems (IES) allows the coordination of several components, such as electric vehicles (EV), to serve various demands simultaneously. This paper focuses on coordinating the CCHP and electric vehicle parking lot (EVPL) integrated with photovoltaic (PV) technology as renewable energy (RE). The residential energy hub (REH) is modeled to integrate these components to meet the demands and minimize REH’s operating costs and carbon emissions. EVPL functions as dynamic electrical storage besides serving EVs. Stochastic programming is used to model RE, EV, loads, and electricity price uncertainties. Demand response (DR) is applied for shiftable electrical loads. The thermodynamic model of heating and cooling loads is developed with flexibility as integrated demand response (IDR) based on the building’s desired temperature. The emission cost model with penalty factors enforces REH to use less-pollutant energy sources. Subsequently, a risk-aversion strategy, namely downside risk constraint (DRC), is implemented to diminish the associated risk as the consequence of uncertainties for the decision-maker. Different constraint level is applied to provide various conservative decision-making strategies for the operator. Summer and winter scenarios with and without DR and flexible thermal loads were used to evaluate the model’s accuracy. The scheduling problem is solved in IEEE 33-bus test system. The results reveal that the DR could reduce the operation cost by 5% in summer and 8% in winter. Moreover, zero risk for summer and winter is gained at the cost of 10.4% and 3.1% increment in operating costs.

Item Type: Article
Additional Information: Funding information: This work was supported from DTE Network+ funded by EPSRC grant reference EP/S032053/1.
Uncontrolled Keywords: Combined cooling, heat and power, Residential energy hub, Electric vehicle parking lot, Demand response, Flexible thermal loads, Downside risk constraint
Subjects: H800 Chemical, Process and Energy Engineering
Department: Faculties > Engineering and Environment > Mathematics, Physics and Electrical Engineering
Depositing User: Elena Carlaw
Date Deposited: 04 Nov 2022 10:05
Last Modified: 18 Nov 2023 03:30
URI: https://nrl.northumbria.ac.uk/id/eprint/50532

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year

View more statistics